Service Charges

Sr. No. Activity Unit Amount (Rs.)
1 Replacement of Riser isolation valve Each --
2 GI riser work upto 4 meters for customer connectivity upto MCV including pre-sleeved hole piece Each --
3 Installation of Half round concrete guard - labour charges Each --
4 Installation of welded riser Meter --
5 Laying of 32/63 mm PE pipeline with reinstatement Meter --
6 Laying of 32/63 mm PE pipeline without reinstatement Meter --
7 Shifting of Service regulator upto 3 meter Each --
8 Riser testing, leakage rectification & clamping of riser. Each --
9 Painting of GI riser & laterals. Meter --
10 Meter checking (In case if meter is found OK) Each --
11 Installation/replacement of meter brackets Each --
12 Installation/replacement of appliance valve Each --
13 Visit charge applicable on second visit/ technical support request from customer/leakage in case of Each --
14 Meter replacement work Each --
15 Inspection of SPL installation Each --
16 Fixing of PVC Clamps only Each --
17 Reconnection (of Temporary Disconnected cases only) Each --
18 Temporary Disconnection Each --
19 Installation of Hole piece without alteration Each --
20 Removal of Hole piece without alteration Each --
21 Only Copper Pipe Work (upto 5 meter) No --
22 Addition / Alteration of GI Pipe Meter --
23 Addition / Alteration of Copper Tubing in addition to job done in SR No 2 Meter --
24 Installation of Meter without alteration Note: CGST & SGST will be applicable extra Each --
25 Removal of Meter without alteration Each --
* Taxes Applicable Extra

Want to find out more?

Contact a member of the sales team for more information.

Contact Us